Dubai Traffic Cut: 70% Faster Travel in JVC
Category News
Last Update 2025-04-20
Reading Time 5 Minutes
51 Visit

Big Changes in Dubai Transport: Travel Time Drops in JVC

5/5 - (2 votes)

In a huge step towards enhancing the quality of life for residents and streamlining the efficiency of its transport network, Dubai has taken a major step. The Roads and Transport Authority (RTA) and Dubai Holding signed an AED 6 billion contract. The target of the project is to implement innovative traffic solutions and improve road infrastructure in the emirate’s most important developed areas.

Special Focus on Jumeirah Village Circle (JVC): 70% Reduction in Travel Time

One of the features of this project is the major improvement in access to the popular Jumeirah Village Circle (JVC). By the creation of four new accesses and the construction of separate intersections, the volume of entry and exit for the area will be doubled. These innovative developments are expected to reduce travel time to and within JVC by as much as 70%, as well as enhance road safety and ease traffic movement at intersections.

dubai roads and transport authority rta

Widespread Enhancements Throughout Dubai

This massive investment does not only reach JVC. It also covers infrastructure developments in a wide range of core areas and projects, such as:

  • Dubai Production City: New bridge construction on Sheikh Mohammed bin Zayed Road will reduce travel time at entry and exit points by up to 50% and improve internal traffic flow.
  • Business Bay: Surface intersection point improvements, pedestrian bridge construction on Sheikh Zayed and Al Khail roads, and internal road upgrades will reduce travel time by more than 30%.
  • Palm Jumeirah: Installing acceleration and deceleration lanes at six key points and two new pedestrian bridge constructions will improve safety and reduce travel time by up to 40%.
  • International City (Phase 3): With the development of the entry road from Manama Street, the new lanes addition, and the internal intersection upgrade with traffic signals, travel time will reduce from 15 minutes to just 5 minutes.
  • Other Areas: This agreement also promises infrastructure development in other areas including Dubai Islands, Jumeirah Village Triangle, Palm Gateway, Al Furjan Gateway, Al Furjan, Jumeirah Park, Arjan, Majan (Phase 1), Nad Al Hamar, Villanova and Serena.

Future Outlook: Smoother Traffic and Better Connectivity

Mattar Al Tayer, Chairman of the Board of Executive Directors and Director General of RTA, emphasized the importance of this strategic partnership. He highlighted that these projects will increase the capacity of entry and exit points by 30% to 70%. By reducing travel times and improving connectivity for residents and tourists, the project will be key to enabling smoother and quicker traffic flow across Dubai. These measures demonstrate Dubai’s continued commitment to developing advanced road infrastructure as well as improving Dubai’s public transport network, to provide the best travel experience for everyone.

Conclusion

Finally, the AED 6 billion RTA-Dubai Holding deal is a landmark in the development of transportation infrastructure in Dubai. With clear emphasis on enhancing access, radically reducing journey times (particularly up to 70% in JVC) and upgrading safety, the project not only tackles the existing traffic woes but also boldly aims at enhancing the quality of life of residents. It reinforces Dubai’s position as a leading, globally connected metropolis. The implementation of these projects is expected to deliver a smoother, more efficient travel experience for everyone.

Source: https://www.propertynews.ae

Articles
Related

Leave a Comment

Your email address will not be published. Required fields are marked *

To top

Callback Request :